Maps of changes
We have included short summaries of each section here.
Section 1 – Quay Street to Liverpool Road
This plan shows the changes to Deansgate between Quay Street and Liverpool Road. The changes include:
-
Two-way segregated cycleway
-
All motorised traffic one-way southbound only
-
Loading bays
-
Blue badge parking bays
-
Pay and display parking bays
-
Controlled pedestrian crossings
-
Zebra crossings
-
Taxi ranks
-
Cycle traffic from Peter Street redirected via Jerusalem Place and Bottle Street
-
Turning points for cyclists to leave Deansgate onto St John Street and Tonman Street
Section 2 – Liverpool Road to Whitworth Street West
This plan shows the changes to Deansgate and Whitworth Street West between Liverpool Road and the Bridgewater Viaduct. The changes include:
-
Two-way segregated cycleway
-
A bus gate on Whitworth Street West
-
Pay and display parking bays
-
Blue badge parking bays
-
Taxi ranks, bus stops and loading bays
-
Turning point for cyclists to leave Deansgate onto Tonman Street
-
Controlled pedestrian crossings at the junction of Liverpool Road and Great Bridgewater Street
-
Controlled crossings at the junction of Deansgate and Whitworth Street West (with ‘rain garden’ drainage)
Section 3 – Bridgewater Viaduct and Chester Road
This plan shows the changes taking place on Bridgewater Viaduct and Chester Road. The changes include:
-
Two-way segregated cycleway
-
Two-way traffic flow
-
New controlled crossing
-
New junction layouts with ‘rain garden’ drainage on Bridgewater Viaduct (Owen Street, Deansgate and Great Jackson Street)